Sunday, October 5, 2008

MAJOR CURRENT PROJECT
DESIGN & CONSTRUCTION OF BREAKWATER & CHANNEL DEEPENING WORKS OF MUARA SUNGAI TERENGGANU, KUALA TERENGGANU, TERENGGANU, MALAYSIA (PHASE 2)

CONSTRUCTION OF SIBU / BAWANG ASSAN / SEREDENG ROAD, (PACKAGE 2: FROM SUNGAI LOBA SATUBAH TO JALAN SEREDENG), SIBU / MUKAH, SARAWAK, MALAYSIA




UPGRADING PROJECT FOR KUALA TERENGGANU AIRPORT – PACKAGE 4(B) RECLAMATION AND BEACH NOURISHMENT



BUILDING CONSTRUCTION WORKS
Sekolah Asrama Latihan Kesihatan & Kompleks, Kuching, Sarawak, Malaysia




MAJOR COMPLETED PROJECT
DEVELOPMENT FOR PELABUHAN TANJUNG PELEPAS, JOHOR, MALAYSIA (PHASE 2)




SECOND INNER HARBOUR DEVELOPMENT AT BINTULU PORT, BINTULU, SARAWAK, MALAYSIA


SITE FILLING & SOIL IMPROVEMENT WORKS FOR THE 3 x 700MW COAL FIRED POWER PLANT, TANJUNG BIN, JOHOR, MALAYSIA


LAND RECLAMATION WORKS FOR THE PROPOSED MARINA PARK, MIRI, SARAWAK, MALAYSIA (PHASE 1 - 4)

DESIGN & CONSTRUCTION OF BREAKWATER & CHANNEL DEEPENING WORKS OF MUARA SUNGAI TERENGGANU, KUALA TERENGGANU, TERENGGANU, MALAYSIA (PHASE 1)


PACKAGE 2B, 2C, 3 & 4 FOR ASSAR PALM OIL REFINERY PROJECT, SENARI, KUCHING, SARAWAK, MALAYSIA

1 comment:

zaza said...

best kalo dapat keje dgn inai kiara ni